

|














 
 


|


Gallery of 2002
Projects - Upstairs Bathroom
|
|
|
Image 9 of 11
|
| This is the view of the new tile work with the soap
dish in the shower enclosure. The mixing valve was totally frozen
when work began on this project. It was totally disassembled, cleaned,
then rebuilt and now operates as good as the day it was new. A
new hose and shower head were added to match the one on the tub.
The original shower head was not able to be salvaged due to extensive
mineral build up that had caused internal corrosion. |
|
By clicking on the "first photo" button on the left,
you will be taken to the first photograph in this series. The "previous
Photo" button will take the viewer to the previous photograph
in this series. The "next photo" button the viewier will
be taken to the next photograph in this series. The "last
photo" button on the left will take the viewer to the last
photograph in this series. To view a slide show of these photographs,
click on the next photo button until it is no longer available
then return to the gallery.
|
|