

|














 
 


|


Gallery of 2002
Projects - Painting and Exterior Restoration
|
|
|
Image 1 of 30
|
| This is the view of the west side of the house as
the painting begins. A local company was selling scaffolding, so
that was the first purchase to begin this project. In this view
all of the lower windows have been scraped, primed, and painted.
A total of 30 tubes of caulk was needed to replace all of the caulking
in these windows which had failed. The two upper windows on the
right of the photograph have been sanded and primed and are awaiting
the final coat of paint. |
|
By clicking on the "first photo" button on the left,
you will be taken to the first photograph in this series. The "previous
Photo" button will take the viewer to the previous photograph
in this series. The "next photo" button the viewier will
be taken to the next photograph in this series. The "last
photo" button on the left will take the viewer to the last
photograph in this series. To view a slide show of these photographs,
click on the next photo button until it is no longer available
then return to the gallery.
|
|